Engineering a Hydrometallurgical PGM Recovery Plant in Spain: From Process Design to Industrial Commissioning in 9 Months
By Proses Makina
Project Location: Spain
Project Duration: 9 Months
Project Team: 24 Professionals
Technology: Hydrometallurgical Processing and Platinum Group Metal Recovery
Project Status: Testing and Commissioning
1. Project Overview
Proses Makina has completed the engineering, manufacturing and installation phases of a high-capacity hydrometallurgical catalytic converter recycling plant in Spain within nine months. The facility has now reached the testing and commissioning stage.
The project was developed for the processing of spent automotive catalytic converter materials and the recovery of Platinum Group Metals (PGMs), including platinum, palladium and rhodium.
Unlike conventional mechanical recycling facilities, a hydrometallurgical PGM recovery plant requires precise control of chemical reactions, temperature, acidity, mixing conditions and liquid-solid separation processes.
The project therefore involved much more than machinery manufacturing. Proses Makina developed an integrated chemical processing system incorporating specially engineered leaching reactors, chemical dosing equipment, industrial instrumentation, PLC-based process control, SCADA monitoring and environmental treatment systems.
A multidisciplinary team of 24 specialists participated in the nine-month project, covering chemical engineering, mechanical design, electrical engineering, automation, manufacturing, installation and commissioning.
One of the central engineering priorities was ensuring that the chemical process, mechanical equipment, automation architecture and environmental protection systems functioned as a coordinated industrial facility.
2. Hydrometallurgical Process Engineering for PGM Recovery
Spent automotive catalytic converters contain platinum, palladium and rhodium distributed within complex ceramic or metallic structures.
Recovering these metals through hydrometallurgical processes requires careful evaluation of feedstock composition, chemical reaction conditions and the behavior of different materials during processing.
The chemical characteristics of the incoming material directly influence the engineering requirements of the plant.
Factors such as particle size distribution, precious metal concentration, support material composition, solid-liquid ratio and chemical reactivity must be considered when developing an industrial processing system.
For the Spain project, the engineering work focused on translating chemical process requirements into equipment designs suitable for continuous industrial operation and controlled batch processing where required.
Particular attention was given to the relationship between leaching conditions, reactor geometry, chemical dosing, temperature regulation and process automation.
The objective was to establish a processing environment in which critical operating parameters could be measured, monitored and adjusted consistently throughout the recovery process.
3. Leaching Tank Design: One of the Most Critical Engineering Decisions
One of the most technically demanding elements of the Spain project was the engineering of the leaching tanks.
In hydrometallurgical processing, a leaching tank is not simply a vessel in which chemicals and raw materials are mixed. Its design directly influences reaction efficiency, chemical consumption, heat transfer, solids suspension and overall process stability.
An incorrectly designed reactor can create dead zones, uneven chemical distribution, excessive sedimentation, poor temperature control and inconsistent reaction conditions.
For this reason, Proses Makina approaches leaching tank design according to the specific characteristics of the material being processed and the chemical requirements of the intended recovery process.
3.1 Material-Specific Reactor Engineering
Different feedstocks require different reactor configurations.
The physical and chemical characteristics of catalytic converter materials influence the selection of tank geometry, construction materials, agitation systems and operating parameters.
During reactor engineering, several factors must be evaluated:
- Particle size and particle density
- Solids concentration and slurry behavior
- Chemical composition of the feedstock
- Type and concentration of the processing chemicals
- Operating temperature and expected reaction conditions
- Corrosion and abrasion resistance requirements
- Required residence time and processing capacity
A reactor designed for one material cannot automatically be expected to provide the same performance with another.
For example, dense particles may require stronger bottom-zone circulation to prevent sedimentation, while fine particles can introduce different challenges related to slurry rheology, mixing and downstream filtration.
The chemical environment also determines which construction materials and protective linings are suitable.
Depending on the process conditions, acid-resistant polymeric materials, engineered linings or specially selected metallic materials may be required.
Material selection must consider chemical compatibility at the actual operating temperature, not merely general resistance to acids.
3.2 Agitator Design and Solids Suspension
Agitation is a critical component of hydrometallurgical reactor performance.
The objective is not simply to rotate an impeller at a particular speed. The mixing system must create a flow pattern that supports the intended chemical reactions.
Important engineering parameters include impeller geometry, impeller diameter, rotational speed, motor power, shaft arrangement, tank dimensions and internal flow conditions.
The correct mixing configuration should support:
- Uniform distribution of processing chemicals
- Effective suspension of solid particles
- Reduction of sedimentation and stagnant zones
- Improved contact between liquid and solid phases
- Consistent temperature and chemical concentration throughout the reactor
Insufficient agitation can cause solids to accumulate at the bottom of the tank and reduce the effective contact area between the material and the leaching solution.
Excessive agitation, however, may increase energy consumption, equipment wear and maintenance requirements without providing a corresponding improvement in recovery performance.
The engineering challenge is therefore to identify an appropriate balance between mixing performance, process requirements and energy efficiency.
3.3 Reactor Geometry and Internal Flow
Tank diameter, liquid height, bottom geometry, baffle arrangements and impeller positioning influence the internal circulation of the slurry.
A poorly designed reactor may contain regions where chemical concentration and temperature differ from the rest of the vessel.
These differences can affect reaction consistency and complicate process control.
In the Spain project, reactor engineering formed part of the overall hydrometallurgical process design rather than being treated as an independent mechanical equipment selection.
The interaction between reactor geometry, agitation and chemical reaction requirements was an important consideration in developing the plant configuration.
3.4 Temperature Control and Heat Transfer
Many hydrometallurgical reactions are sensitive to temperature.
Temperature can influence reaction kinetics, chemical consumption, dissolution behavior and the stability of process conditions.
For this reason, leaching tank design must consider how heat is introduced, transferred, distributed and controlled.
Depending on the process requirements, temperature management may involve heating jackets, external heat exchangers or other compatible heating arrangements.
The location of temperature measurement points is also important.
A sensor installed in a poorly circulated area may not accurately represent the bulk process temperature.
Effective temperature control therefore depends on the combined design of the heating system, agitation arrangement, sensor placement and automation strategy.
4. pH Measurement and Chemical Dosing Control
Accurate pH measurement is particularly important in hydrometallurgical processing because acidity affects chemical reactions, metal behavior and the operating conditions of different processing stages.
In industrial applications, pH monitoring requires more than installing a conventional laboratory electrode inside a tank.
The instrumentation must be suitable for the chemical environment, operating temperature, solids content and maintenance requirements.
4.1 Industrial pH Sensor Selection
For acidic hydrometallurgical applications, pH measurement systems must be selected according to the actual process conditions.
Important considerations include:
- Chemical resistance of the sensor body and wetted components
- Compatibility with the operating pH range
- Temperature resistance and compensation
- Resistance to fouling and abrasive particles
- Measurement stability during continuous operation
- Calibration accessibility and maintenance requirements
Industrial pH probes may incorporate chemically resistant housings, specialized reference systems and automatic temperature compensation.
Where the process involves aggressive chemicals or high solids concentrations, sensor protection and installation arrangements become particularly important.
In highly acidic solutions, pH measurement alone may not provide sufficient information about the total acid concentration. Depending on the process, supplementary analytical measurements and chemical concentration monitoring may also be necessary.
4.2 Sensor Positioning and Measurement Reliability
The positioning of pH sensors affects measurement quality.
A sensor placed close to a chemical dosing point may detect a localized concentration that does not represent the overall tank conditions.
Similarly, installation in a stagnant zone may produce delayed or misleading measurements.
Sensor placement must therefore be coordinated with the reactor’s internal circulation pattern and chemical dosing arrangement.
The engineering design must also allow for calibration, inspection, cleaning and replacement without creating unnecessary operational difficulties.
4.3 Automated Chemical Dosing
pH measurement becomes more valuable when integrated into the process control system.
Within a PLC-controlled architecture, pH measurements can be used to supervise chemical dosing operations and maintain the required process conditions.
A typical control sequence involves:
- Measuring the process pH through an industrial sensor.
- Transmitting the measurement to the PLC.
- Comparing the measured value with the defined operating range.
- Adjusting the dosing equipment according to the control strategy.
- Continuously monitoring the response of the process.
- Generating alarms or restricting dosing when abnormal conditions are detected.
Because chemical reactions may not respond immediately to dosing changes, the control logic must account for mixing delays and the dynamic behavior of the process.
Excessive or poorly timed chemical addition can create unnecessary chemical consumption and unstable operating conditions.
The PLC strategy must therefore be developed according to the actual chemical process rather than relying on generic dosing logic.
5. Industrial Temperature Sensors and Automated Thermal Control
Temperature measurement is another critical component of hydrometallurgical plant automation.
For the Spain project, temperature monitoring and control formed an important part of the integrated instrumentation and process engineering approach.
5.1 Selection of Temperature Sensors
Industrial temperature measurement commonly uses resistance temperature detectors (RTDs), such as Pt100 sensors, or thermocouples.
The appropriate technology depends on the operating temperature range, required accuracy, response time and installation environment.
For many hydrometallurgical applications, Pt100 sensors offer suitable measurement accuracy and stability.
However, the sensor’s protective assembly is equally important.
Temperature sensors exposed to acidic liquids or aggressive vapors must be installed using compatible thermowells, protective sleeves or other engineered arrangements.
The selection of protective materials must account for corrosion, temperature, mechanical stresses and the specific chemicals present in the system.
5.2 Temperature Measurement Locations
A single temperature reading may not always be sufficient for a large industrial reactor.
Depending on tank geometry and process requirements, measurement at multiple locations may be necessary to identify temperature differences or evaluate heating performance.
Temperature measurement points should be selected with consideration of fluid circulation, heat transfer surfaces and the risk of localized overheating.
5.3 PLC-Based Temperature Regulation
Temperature sensors provide continuous process data to the control system.
The PLC can use these measurements to regulate heating equipment according to the defined process parameters.
Control functions may include:
- Monitoring actual process temperature
- Comparing measurements with operating setpoints
- Controlling heating valves or other heating equipment
- Managing heating and cooling sequences where applicable
- Generating high-temperature and low-temperature alarms
- Preventing unsafe heating operation through protective interlocks
Temperature control is especially important where reaction behavior changes significantly with thermal conditions.
Coordinating heating control with agitation and liquid-level monitoring can also help protect equipment and improve operational consistency.
6. PLC and SCADA System Engineering Developed by Proses Makina
One of the major engineering components of the Spain project was the design of the plant’s PLC and SCADA automation architecture by Proses Makina.
A hydrometallurgical recycling facility contains multiple interconnected systems that must operate according to defined process sequences.
Leaching reactors, chemical dosing equipment, transfer pumps, valves, heating systems, instrumentation and environmental treatment units cannot be managed effectively as unrelated pieces of equipment.
The automation architecture was therefore developed around the requirements of the complete industrial process.
6.1 PLC Control Architecture
The Programmable Logic Controller (PLC) serves as the central control platform for automated process operations.
Its functions include receiving signals from field instruments, processing operating conditions, executing control sequences and transmitting commands to equipment.
The PLC architecture must accommodate different types of signals, including:
- Analog signals from pH and temperature transmitters
- Liquid-level and flow measurements
- Pressure measurements where required
- Digital signals from pumps, motors and valves
- Equipment status and fault information
- Safety-related permissives and interlocks
The control program coordinates equipment operation according to the defined process requirements.
For example, chemical dosing may be permitted only when the necessary process conditions are satisfied.
Similarly, heating equipment may be restricted when liquid level, agitation or other essential operating conditions are outside acceptable limits.
These control functions reduce dependence on continuous manual intervention and support more consistent operation.
Safety-critical protective functions must be assessed separately and implemented using an appropriate safety architecture rather than relying solely on ordinary PLC or SCADA functions.
6.2 SCADA Monitoring and Operator Interface
The Supervisory Control and Data Acquisition (SCADA) system provides operators with a centralized interface for monitoring and supervising the plant.
Proses Makina’s SCADA engineering approach focuses on making complex process information accessible through structured operating screens.
The system architecture can support visualization of reactor conditions, equipment status, chemical dosing operations, temperatures, pH values, process alarms and operating sequences.
SCADA functionality includes the ability to organize operational information into process-specific screens and provide operators with an overview of the facility.
Depending on the implemented configuration, the system may also support:
- Real-time visualization of process measurements
- Historical trend recording
- Alarm identification and event logging
- Operator access management
- Equipment status monitoring
- Setpoint management within authorized limits
- Process data collection for technical evaluation
Historical process information is particularly useful during commissioning.
Recorded measurements can help engineers evaluate process behavior, identify deviations and assess the effects of operating adjustments.
6.3 Integrated Process Control
The effectiveness of industrial automation depends on the interaction between instrumentation, mechanical equipment and control software.
A correctly selected pH sensor cannot deliver reliable process control if it is installed in an unsuitable location.
Similarly, accurate temperature measurement cannot compensate for inadequate reactor circulation or poorly designed heating equipment.
For this reason, Proses Makina developed the automation engineering in coordination with the mechanical and chemical process requirements.
The integration of sensors, actuators, PLC logic and SCADA monitoring provides a structured framework for operating the hydrometallurgical plant.
7. Engineering an Acid-Based Plant: Air Treatment and Emission Control
Hydrometallurgical PGM recovery involves chemical processing environments in which acidic liquids, corrosive vapors and potentially hazardous emissions must be carefully managed.
Environmental protection was therefore an essential part of the Spain facility’s engineering scope.
The plant design incorporated air treatment considerations to manage emissions associated with acid-based processing operations.
7.1 Acid Vapor Collection
The first stage of effective emission control is capturing potentially contaminated air as close as practicable to its source.
Depending on the equipment configuration and process chemistry, collection systems may include enclosed processing equipment, local extraction arrangements, corrosion-resistant ductwork and dedicated exhaust connections.
The design of the extraction system must consider airflow, pressure losses, chemical compatibility and the potential formation of corrosive condensates.
Proper capture design is essential because a treatment system cannot effectively remove pollutants that are not collected and directed to it.
7.2 Chemical Scrubbing Systems
Wet chemical scrubbers are commonly used in industrial acid-gas treatment applications.
In these systems, contaminated air is brought into contact with a treatment liquid selected according to the chemical characteristics of the pollutants.
The treatment process may involve absorption and chemical neutralization.
Scrubber engineering requires evaluation of gas flow rate, pollutant characteristics, liquid circulation, contact efficiency, pressure drop and chemical dosing requirements.
Where appropriate, pH measurement and automated dosing systems can be integrated into the scrubber liquid circuit to support stable treatment conditions.
The selection of scrubber materials is also critical because equipment may be exposed to corrosive gases, acidic condensates and treatment chemicals.
Additional treatment stages may be necessary depending on the actual gas composition and applicable emission limits.
7.3 Air Treatment and European Environmental Requirements
The environmental systems for the Spain project were designed with the objective of meeting applicable European Union and Spanish environmental requirements.
This includes consideration of relevant industrial emission limits, safe chemical handling, appropriate exhaust treatment and environmental monitoring requirements.
For an acid-based recycling facility, air treatment must be evaluated as part of the process engineering design rather than as an optional accessory.
Final demonstration of regulatory compliance requires the applicable permits, commissioning measurements and, where required, emissions testing by authorized bodies.
8. Industrial Wastewater Treatment and Water Management
Hydrometallurgical facilities must also manage liquid streams generated by chemical processing, equipment cleaning, filtration, scrubber operation and other industrial activities.
These streams can contain residual acidity, dissolved metals, suspended solids and process chemicals.
Consequently, wastewater treatment must be designed according to the composition and expected volume of the liquid streams.
8.1 Wastewater Characterization and Segregation
Different wastewater streams may require different treatment methods.
Highly concentrated process solutions should not automatically be combined with lower-concentration wash waters or other liquid streams.
Segregation can improve treatment efficiency and help prevent unwanted chemical reactions.
Wastewater characterization is therefore an important part of treatment plant engineering.
8.2 pH Neutralization and Metal Removal
Industrial wastewater treatment may involve controlled neutralization, chemical precipitation, solid-liquid separation and additional polishing stages where required.
In neutralization systems, pH sensors provide process measurements to the control system.
The PLC can regulate dosing equipment according to defined treatment parameters.
However, the effectiveness of metal removal depends not only on pH but also on metal speciation, solution chemistry, competing ions and the treatment sequence.
Different metals may require different precipitation conditions or supplementary treatment technologies.
The engineering objective is to develop a treatment sequence appropriate for the actual wastewater composition.
8.3 Solid-Liquid Separation and Sludge Management
Following chemical treatment, precipitated solids must be separated from the treated water.
Depending on the process requirements, this may involve settling, filtration or other solid-liquid separation technologies.
The resulting sludge must be characterized and managed according to applicable waste regulations.
Where technically and economically feasible, selected metal-bearing residues may also be evaluated for further recovery.
8.4 European Union Wastewater Standards
The wastewater treatment engineering for the Spain project was developed with consideration of the applicable EU and Spanish environmental framework.
The objective is to ensure that industrial liquid discharges are managed through appropriate treatment systems and assessed against the limits established by the relevant permits and receiving-water or sewer requirements.
Actual discharge compliance must be demonstrated through appropriate water analysis, monitoring and regulatory verification.
For Proses Makina, integrating wastewater treatment with the hydrometallurgical process is an important part of delivering a complete industrial recycling facility.
9. Integrating Environmental Treatment with PLC and SCADA
Air and wastewater treatment systems are important components of the plant’s overall control architecture.
Rather than treating environmental equipment as completely separate utilities, the engineering approach considers their interaction with the main chemical process.
Environmental instrumentation may include pH sensors, liquid-level transmitters, flow measurement devices, pressure monitoring and equipment status signals.
These measurements can be integrated into the PLC and SCADA system to provide operational visibility and coordinated control.
For example, an acid-gas scrubber may require confirmation of adequate liquid circulation before an associated processing operation is permitted to start.
Similarly, wastewater neutralization equipment may require minimum liquid levels, operating pumps and valid sensor readings before chemical dosing is enabled.
Where required by the risk assessment, interlocks can prevent process operations from continuing when essential treatment equipment is unavailable.
This integration is particularly important in acid-based facilities because environmental protection depends on the reliable operation of several interconnected systems.
The final configuration of these functions must reflect the process risk assessment, equipment design and applicable safety requirements.
10. Nine Months of Engineering, Manufacturing and Installation
The Spain hydrometallurgical recycling project progressed from chemical process engineering to industrial installation within nine months.
The project involved coordination between multiple technical disciplines and manufacturing activities.
The main development stages included:
- Chemical process evaluation and technical requirements
- Hydrometallurgical reactor and equipment engineering
- Technical drawings and mechanical design
- Instrumentation and sensor selection
- PLC and SCADA architecture development
- Machinery and equipment manufacturing
- Air treatment and wastewater treatment system engineering
- Mechanical and electrical integration
- On-site installation in Spain
- Testing and commissioning preparation
A total of 24 professionals contributed to the project:
|
Discipline |
Team Members |
|
Project Managers |
2 |
|
Engineers |
8 |
|
Field Implementation Specialists |
10 |
|
Testing Specialists |
2 |
|
Occupational Health and Safety Specialist |
1 |
|
IT and Software Specialist |
1 |
|
Total |
24 |
The project required coordination between chemical process engineering, mechanical manufacturing, electrical systems, automation programming, field installation and operational safety.
Completing the engineering, manufacturing and installation phases within nine months was a significant milestone for Proses Makina.
11. Testing and Commissioning of the Hydrometallurgical Plant
Following the completion of installation, the Spain facility entered the testing and commissioning stage.
Commissioning activities are essential for verifying that individual equipment components and integrated systems operate according to their intended design.
For a hydrometallurgical facility, commissioning involves both mechanical verification and process-related evaluation.
Mechanical and Electrical Verification
This stage includes checking equipment operation, pump rotation, valve functionality, electrical connections, motor controls and instrument signals.
Instrumentation Calibration
pH sensors, temperature transmitters and other measurement instruments must be checked and calibrated according to their operating requirements.
Measurement reliability is particularly important because automated control decisions depend on the accuracy of field instruments.
PLC and SCADA Functional Testing
Automation verification includes checking input and output signals, operating sequences, alarm functions, control logic and communication between field equipment and the supervisory system.
Environmental System Verification
Air extraction, scrubbing equipment, wastewater treatment units and related instrumentation must be tested under the appropriate operating conditions.
Environmental performance must be verified against the applicable project and regulatory requirements.
Feedstock Trials and Process Evaluation
Trials using representative catalytic converter materials provide information about the interaction between reactor design, chemical process conditions, equipment performance and control systems.
Final processing capacity, metal recovery efficiency, chemical consumption and operating performance will be evaluated following the completion of the relevant commissioning and verification activities.
12. Why Integrated Engineering Matters in Hydrometallurgical Recycling
The Spain project demonstrates that the performance of a hydrometallurgical recycling plant depends on the interaction of several engineering disciplines.
Reactor design influences mixing, temperature distribution and chemical reaction conditions.
Sensor selection and installation influence measurement accuracy.
PLC programming determines how equipment responds to operating conditions.
SCADA systems provide the information required for process supervision and technical evaluation.
Air treatment and wastewater treatment systems address the environmental requirements associated with chemical processing.
A weakness in one of these areas can affect the performance of the entire facility.
For this reason, Proses Makina’s approach is to develop hydrometallurgical equipment, automation and environmental treatment systems as interconnected parts of the same industrial process.
The Spain project brought these engineering activities together within a nine-month implementation period.
13. Advancing Hydrometallurgical Recycling Technology
The high-capacity catalytic converter recycling plant in Spain represents an important reference project for Proses Makina’s hydrometallurgical engineering and manufacturing capabilities.
The project combined material-specific leaching reactor design, chemical process engineering, industrial instrumentation, PLC and SCADA development, environmental treatment engineering and international field implementation.
It also demonstrated the importance of designing equipment around the characteristics of the material and the requirements of the chemical process.
As the facility progresses through commissioning, the engineering work provides a foundation for further development of industrial PGM recovery technologies and other precious metal recycling applications.
Proses Makina continues to design and manufacture integrated hydrometallurgical processing systems, leaching reactors, chemical processing equipment, industrial automation solutions and environmental treatment systems for metal recovery facilities.
14. Frequently Asked Questions
How long did the Spain hydrometallurgical project take?
Proses Makina completed the engineering, manufacturing and installation phases within nine months. The facility is currently in the testing and commissioning stage.
What metals are targeted by the facility?
The facility is designed for processing spent catalytic converter materials associated with platinum, palladium and rhodium recovery.
Why is leaching tank design important?
Leaching tank design influences solids suspension, chemical distribution, heat transfer, reaction conditions and operational reliability. Reactor configuration must be selected according to the characteristics of the material being processed.
How are pH and temperature controlled?
Industrial sensors transmit process measurements to the PLC, which executes the programmed control strategy for equipment such as dosing pumps and heating systems. SCADA provides centralized monitoring and operating information.
Did Proses Makina develop the plant automation?
Yes. PLC and SCADA system engineering formed part of Proses Makina’s project scope, alongside chemical process engineering, mechanical equipment manufacturing and plant integration.
How are acid vapors and industrial wastewater managed?
The plant incorporates environmental treatment engineering for acid-related emissions and industrial liquid streams. These systems are designed with reference to applicable European and Spanish environmental requirements, with final compliance subject to the necessary testing and regulatory verification.
Does Proses Makina manufacture complete hydrometallurgical plants?
Yes. Proses Makina develops and manufactures integrated industrial recycling and metal recovery systems, including process equipment, automation and associated treatment technologies, according to project requirements.
15. Develop Your Hydrometallurgical Project with Proses Makina
Planning a catalytic converter recycling facility, PGM recovery plant or industrial hydrometallurgical processing system?
Proses Makina provides process engineering, material-specific leaching reactor design, machinery manufacturing, PLC and SCADA integration, and environmental treatment solutions for industrial metal recovery applications.
Contact Proses Makina
Website: www.proses-makina.com
Email: info@proses-makina.com
WhatsApp: +90 507 788 91 09